'Detailed Estimate for the Implementation of Customer Oriented integrated Software PHASE II :

STORES: NIL

CASH:

Local Purchase:

Computer Networking materials:

SNo

Name of the item

QTY

Rate

Amount

1

Server with 10GB hard disk on raid 5 implementation and 4/8GB tape drive to work on sco open server and oracle

1

900,000

900,000

2

Backup server as above but without raid 5 implimentation

1

700,000

700,000

3

NMS works station used for network management

1

200,000

200,000

4

EI multiplexer Quality

1

1,400,000

1,400,000

5

Centrol router

1

220,000

220,000

6

Remote roter

18

21,000

378,000

7

Interface cables (Roter to modem)

36

2,200

79,200

8

Terminal Server 8 port

2

18,000

36,000

9

High speed 64 K RAD modem V-35 interface (a)

6

34,000

204,000

(b)

6

54,000

324,000

10

Low sppeed 33.6 K remote manageble modems

13

34,000

442,000

11

Interface converter G.703/V.35

11

54,000

594,000

12

64 K drop insert unit to be used at Mangalagiri

2

118,000

236,000

13

8 port SNMP manged Ethernet hubs

12

28,000

336,000

14

SCO Open Server software for 55 users

1

170,000

170,000

15

SCO Open Server SMP for additional CPU

1

52,000

52,000

16

64 K Data cards to be used in primary MUX for ten remote locations out side Guntur Town

24

25,000

600,000

17

Networking cabling expenditure

1

200,000

200,000

18

Windows NT - 100 users

1

160,000

160,000

Total:

7,231,200

COPUTER FURNITURE:

1

Godrej Make Integrated Work Stations

10

4,700

47,000

2

Godrej Make Computer Chairs

20

3,960

79,200

TOTAL:

126,200

Electrical items:

1

5 A Switches

200

15

3,000

2

5A - 3 pin Sockets

200

20

4,000

3

Indicators

60

25

1,500

4

Boxes(Electrical)

60

25

1,500

5

3/20 Copper Wire in meters

1000

5

5,000

6

7/20 copper Wire in meters

400

14

5,600

7

Electronic Multimeter

1

5,000

5,000

8

Plastic Channels 500 mts

500M

30

15,000

9

Safety shoes

6

300

15,000

10

CAT-5 cables

10000 metrs

30

30,000

85,600

Tools

1

Rj 45 Climping tool

2

3,000

6,000

2

Screw Driver Sets

4

150

600

3

Spanner Sets

3

275

825

4

Drilling machine

1

5,000

5,000

Total

12,425

Transportation

1

4 Wheeler Vehicle for transporting

men and material to the sites in

4

9,000

36,000

the different places in Guntur SSA

Total

36,000

Labour

1

3 Mazdoors for 180 days

540

70

37,800

(3x180x70)

Total

37,800

GRAND TOTAL:

7,529,225

consolidation:

Computer Networking materials:

7,231,200

Computer Furniture

1,26,200

Electrical items:

85,600

Tools

12,425

Transportation

36,000

Labour

37,800

Grand Total:

75,29,225

The estimate prepared for the computer networking of Guntur SSA to implement

the integrated software package and office automation phase II. Computers were received

and the installation of computers is in progress. The rate and quantites are mentioned for

the networking is with reference to the circle office Lr. no:TA/Comp/6-24/96-97 dated at

Hyderabad the 15-12-97. The networking will be done by the the vendors. This work will be

completed within four months after the receipt of the materials.

HINT: include scanners@20000/-, network rack @40,000/- ,Magnetic tape drive @300000/-

G S Rama Prasad

SDE Computers,

%GM Telecom,1st L, CM ngr,

GUNTUR - 522 007.